Darch Plaza – Linear Heat Detection Cable

Darch Plaza – Linear Heat Detection Cable

Darch Plaza – Linear Heat Detection Cable Home » Projects BACKGROUND: As incumbents for the fire protection maintenance we initially received a callout to an alarm activation. Cause was identified to be linear heat detection cable located within the...
197 St. Georges Terrace – Fire Pump Replacement

197 St. Georges Terrace – Fire Pump Replacement

197 St. Georges Terrace – Fire Pump Replacement Home » Projects BACKGROUND: Engaged in 2020 by Warrington Capital Partners, Safetytech Fire Services carried out the replacement of the electric and diesel pumpset within the basement level sprinkler valve...
Durack Institute Of Technology – Boosted Flow Test

Durack Institute Of Technology – Boosted Flow Test

Durack Institute Of Technology – Boosted Flow Test Home » Projects BACKGROUND: In 2020 Safetytech were engaged to carry out a 5 Yearly overhaul of the fire hydrant system, fire pump set and water storage tanks.  CHALLENGES: Based in Geraldton this project...
Iluka Resources, Cataby – Boosted Flow Test

Iluka Resources, Cataby – Boosted Flow Test

Iluka Resources, Cataby – Boosted Flow Test Home » Projects BACKGROUND: Engaged in 2020, Safetytch conducted the fire hydrant system – 5 yearly fire tests including a Boosted Flow Test with our very own fire tender truck. CHALLENGES: Scheduling boosted...
Belmont Park Racecourse – Annual Flow Test

Belmont Park Racecourse – Annual Flow Test

Belmont Park Racecourse – Annual Flow Test Home » Projects BACKGROUND: Safetytech were engaged by CIMIC on behalf of Golden Group to relocate the fire boosted cabinet and carry out the boosted flow testing as part of the infrastructure works for the...
Crown Casino – Fire Hose Reel change outs

Crown Casino – Fire Hose Reel change outs

Crown Casino – Fire Hose Reel change outs Home » Projects BACKGROUND: Over 2020 and 2021 Saferytech have been engaged to change our all the fire hose reels throughout the Crown Casino Perth. CHALLENGES: With the casino operating 24/7 365, implementing...
Mosman Park Shopping Centre

Mosman Park Shopping Centre

Mosman Park Shopping Centre Home » Projects » Page 4 BACKGROUND: 2019, Engaged by Badge Construction at the Coles Shopping Centre and speciality tenancies to complete a project where another contractor was unable to complete the project.  CHALLENGES: The project was...
Esplanade – Brigade Board Replacement

Esplanade – Brigade Board Replacement

Esplanade – Brigade Board Replacement Home » Projects » Page 4 BACKGROUND: Our after hours technician received a call from building management advising of fault on the Fire Indicator Panel. Upon arrival and further investigation our technician identified that...
DMIRS

DMIRS

DMIRS Home » Projects » Page 4 BACKGROUND: Safetytech Fire Service have been the incumbent fire services contractor for 5 of DMIRS (Dept. of Mine, Industry Regulation & Safety) sites since 2016. The mission of DMIRS is to support a safe, fair and reasonable future...
130 Stirling Street – Fire Pump Replacement

130 Stirling Street – Fire Pump Replacement

130 Stirling Street – Fire Pump Replacement Home » Projects » Page 4 BACKGROUND: In 2019 Savills engaged Safetytech as a third party to review the fire diesel pump. Safetytech identified the motor had blown and required a full replacement. CHALLENGES: Removing...
Manoah House – Fire Pump Replacement

Manoah House – Fire Pump Replacement

Manoah House – Fire Pump Replacement Home » Projects » Page 5 BACKGROUND: Awarded Maintenance Contract in July 2014. Post completion of first monthly inspection it was identified the the diesel pump power was fluctuating significantly. Our in-house diesel...