Durack Institute Of Technology – Boosted Flow Test
BACKGROUND:
In 2020 Safetytech were engaged to carry out a 5 Yearly overhaul of the fire hydrant system, fire pump set and water storage tanks.
CHALLENGES:
Based in Geraldton this project needed our utmost attention to ensure no replacement parts were missed.
SOLUTIONS:
Our sophisticated portal for listing assets was able to give a detailed description of each component within each asset leave zero room for error. We completed this project ahead of time and on-budget.
PROJECT VALUE:
$25 Thousand.
For A Free Site Audit & Quote