Darch Plaza – Linear Heat Detection Cable Home » Projects BACKGROUND: As incumbents for the fire protection maintenance we initially received a callout to an alarm activation. Cause was identified to be linear heat detection cable located within the...
197 St. Georges Terrace – Fire Pump Replacement Home » Projects BACKGROUND: Engaged in 2020 by Warrington Capital Partners, Safetytech Fire Services carried out the replacement of the electric and diesel pumpset within the basement level sprinkler valve...
Durack Institute Of Technology – Boosted Flow Test Home » Projects BACKGROUND: In 2020 Safetytech were engaged to carry out a 5 Yearly overhaul of the fire hydrant system, fire pump set and water storage tanks. CHALLENGES: Based in Geraldton this project...
Iluka Resources, Cataby – Boosted Flow Test Home » Projects BACKGROUND: Engaged in 2020, Safetytch conducted the fire hydrant system – 5 yearly fire tests including a Boosted Flow Test with our very own fire tender truck. CHALLENGES: Scheduling boosted...
Belmont Park Racecourse – Annual Flow Test Home » Projects BACKGROUND: Safetytech were engaged by CIMIC on behalf of Golden Group to relocate the fire boosted cabinet and carry out the boosted flow testing as part of the infrastructure works for the...
Crown Casino – Fire Hose Reel change outs Home » Projects BACKGROUND: Over 2020 and 2021 Saferytech have been engaged to change our all the fire hose reels throughout the Crown Casino Perth. CHALLENGES: With the casino operating 24/7 365, implementing...
150 St. Georges Terrace Home » Projects BACKGROUND: Engaged by Valmont Interiors in 2017 to carry out the fire services alteration to level 5 for Talent International. CHALLENGES: High Rise buildings housing high profile companies need to careful consideration...
111 St. Georges Terrace Home » Projects BACKGROUND: Engaged by Valmont Interiors in 2019, we completed a dry fire fit-out over 5 floors for building managers JLL. CHALLENGES: The existing building fire services layout felt short of compliance in a number of...
140 St. Georges Terrace Home » Fitout BACKGROUND: Engaged by Valmont Interiors to complete various fitouts on a number of levels between 2017 and 2019. CHALLENGES: High Rise buildings housing high profile companies need to careful consideration when planning fit out...
Garden Office Park Home » Projects BACKGROUND: Engaged by Valmont Interiors in 2019, Safetytech completed the fire detection and occupant warning system alterations for level 2 & 3 base build fit-out. CHALLENGES: The existing system was not compliant to...
Dept. of Veterans Affairs Home » Projects BACKGROUND: In 2020 Safetytech were engaged by Opra Projects to carry out the internal fire services fit-out works at Dept. of Veterans Affairs. CHALLENGES: Consulted documentation differed from our understanding of the...
Airflite Home » Projects BACKGROUND: Engaged by Airflite in 2019, Safetytech completed the fire detection and evacuation system works within the cargo shed extension. CHALLENGES: Working “air-side” at perth airport can be challenging especially with...