Select Page
150 St. Georges Terrace

150 St. Georges Terrace

150 St. Georges Terrace BACKGROUND: Engaged by Valmont Interiors in 2017 to carry out the fire services alteration to level 5 for Talent International. CHALLENGES: High Rise buildings housing high profile companies need to careful consideration when planning fit out...
111 St. Georges Terrace

111 St. Georges Terrace

111 St. Georges Terrace BACKGROUND: Engaged by Valmont Interiors in 2019, we completed a dry fire fit-out over 5 floors for building managers JLL. CHALLENGES: The existing building fire services layout felt short of compliance in a number of areas including lack of...
140 St. Georges Terrace

140 St. Georges Terrace

140 St. Georges Terrace BACKGROUND: Engaged by Valmont Interiors to complete various fitouts on a number of levels between 2017 and 2019. CHALLENGES: High Rise buildings housing high profile companies need to careful consideration when planning fit out works....
Garden Office Park

Garden Office Park

Garden Office Park BACKGROUND: Engaged by Valmont Interiors in 2019, Safetytech completed the fire detection and occupant warning system alterations for level 2 & 3 base build fit-out. CHALLENGES: The existing system was not compliant to AS1670 with many...
Dept. of Veterans Affairs

Dept. of Veterans Affairs

Dept. of Veterans Affairs BACKGROUND: In 2020 Safetytech were engaged by Opra Projects to carry out the internal fire services fit-out works at Dept. of Veterans Affairs.  CHALLENGES: Consulted documentation differed from our understanding of the how the fire system...
Airflite

Airflite

Airflite BACKGROUND: Engaged by Airflite in 2019, Safetytech completed the fire detection and evacuation system works within the cargo shed extension. CHALLENGES: Working “air-side” at perth airport can be challenging especially with small aircraft...
Leeuwin Barracks

Leeuwin Barracks

Leeuwin Barracks BACKGROUND: Engaged by Hoskins in 2019 Safetytech Designed and Constructed the fire sprinkler services to the BAE Systems, Leeuwin Barracks – Bridge Simulator Installation Project. CHALLENGES: Working in an military environment was challenging....
St. George & Victoria Apartments

St. George & Victoria Apartments

St. George & Victoria Apartments BACKGROUND: Engaged in 2020 to engineer a concept to address the existing cladding to the building utilising fire sprinklers. CHALLENGES: With the building at full capacity with residents, access would prove to be a great...
140 William St. – Passport Office

140 William St. – Passport Office

140 William St. – Passport Office BACKGROUND: Engaged by Valmont Interiors carry out a fitout to level 1 – Passport Office. Our scope was to make the existing system compliant for both wet and dry fire services. CHALLENGES: Whilst onsite another trade...
RSL – Geraldton

RSL – Geraldton

RSL – Geraldton BACKGROUND: Engaged by RSL Geraldton in 2018 our scope was to retrofit the existing building with; Fire Sprinkler System Upgrade of Fire indicator Panel Board. Fire System Interfacing CHALLENGES: Installing a sprinkler system to a live building...
London House

London House

London House BACKGROUND: Engaged by Valmont in 2017 to carry out a fitout to Level 9 for tenant BAILLIEU HOIST. The sprinkler system and detection/evacuation system required alterations and compliance. CHALLENGES: Previous fitouts carried out on this floor were not to...
181 Adelaide Terrace

181 Adelaide Terrace

181 Adelaide Terrace BACKGROUND: Engaged by Valmont in 2018 to carry out a fitout to level 2 & 3.    CHALLENGES: Architectural features played a large role in this project. Sprinkler heads, flush plates, detectors and speakers needed to match different colors...